
Full Lead Service Line Replacement Toronto
End-to-end replacement covering both the city-side and private-side sections in one coordinated dig — faster, cheaper, one permit.
A full lead service line replacement covers both sections — the private portion (your side, from property line to meter) and the public portion (the city's side, from the water main under the street to your property line) — in a single coordinated project. It's the most thorough solution and, when properly timed, often the most cost-effective.
With both crews mobilized at the same time, there's one trench, one permit coordination, one restoration. No coming back in six months for the other half. And because the entire lead path is removed in a single project, you qualify for the maximum subsidy available under the Toronto Lead Pipe Replacement Program.
Signs You Need This Service
- You want to eliminate all lead from your water supply in a single project
- The city has notified you that your public-side portion is eligible for replacement
- You want to qualify for the maximum Toronto Lead Pipe Replacement Program subsidy
- You're planning a major renovation and want the water infrastructure resolved while the yard is already disrupted
- A water test showed lead levels significantly above Health Canada's guideline — indicating lead on both sides
What's Included
- Private and public section replaced in one coordinated project
- Single permit application covering the full line scope
- Coordination with Toronto Water for the city-main connection
- New copper or PEX from the main to your meter — no lead remaining in the path
- Trench opened once, backfilled once, surface restored once
- Toronto Lead Pipe Replacement Program application for maximum subsidy
- Certified lead disposal and written completion documentation
How It Works
Assessment of full line
We inspect both the private-side entry point and request the city's records on your address to confirm the public section status and depth.
Coordinated permit
A full-line permit is filed with the City of Toronto and coordinated with Toronto Water's district office. This ensures both crews can work on the same day.
Program application
We file the Toronto Lead Pipe Replacement Program application concurrently. Full-line replacements typically qualify for the highest available subsidy.
One-day coordination
Our crew handles the private section while Toronto Water handles or oversees the public section. The trench is opened along the full run. Both connections are made the same day.
Test, restore, document
The full line is pressure-tested from main to meter. Trench is restored. You receive a written record of the completed replacement.
Full-line replacements are the gold standard. They eliminate all lead from the water supply to your home and often qualify for the largest city subsidies. Ask us about current program funding when you call. Toronto Lead Pipe Solutions is ready to help.
Questions & Answers
How is a full-line replacement different from a private-side replacement?
How long does a full-line job take?
Is the city-side work free?
Can I do the private side now and the public side later?
Free Quote — No Obligation
Call or text. We respond within 2 hours.
(647) 424-5121Request Quote OnlineReady to get your lead pipe replaced?
Call Toronto Lead Pipe Solutions or request a quote online. Fixed prices, permitted work, done in a day.
(647) 424-5121